No burden as long as you’re already prepared After a long wait by the industry, OSHA finally made the new 29 CFR Part 1926, Cranes and Derricks in Construction Regulation…
Author
ZacharyParnell
SafetyVideos
OSHA Construction Crane Rule – Assembly & Disassembly – ITI
by ZacharyParnell
October 19, 2010
The second installment in the OSHA Construction Crane Rule (29CFR1926.1400 Subpart CC) Series gives viewers an understanding of 29CFR1926.1403 – Assembly and Disassembly (click this link to access the video).…
The use of multi-part braided slings appears to be returning to the marketplace. In the fabrication of these slings, generally a single wire rope is braided or helically laid back against its own body to form an eye & eye sling.
SafetyVideos
OSHA Construction Crane Rule Video Series – Wire Rope Inspection
by ZacharyParnell
October 4, 2010
Beginning our series on the New Federal OSHA Construction Crane Rule – 29CFR1926.1400 Subpart CC – we have created a video outlining section 1413 – Wire Rope Inspection & Categories.