Bullish demand from the Americas has seen sales for Liebherr mobile harbour cranes (MHC) double this year compared with 2010 asdemand for investment in cargo handling equipment remains unbroken, says the global manufacturer.
Crane Safety
A three axle city type All Terrain crane ended up on its roof today after coming down the long steep Ebchester Hill, in the village of Ebchester in County Durham the UK. The hill has an escape lane as it approaches the village and joins the main road – the A-694 – in a T-Junction.
Kobelco is ready to start shipping its new G-Series medium sized range of crawler cranes, announced at Conexpo. The company has now confirmed that its G-Series of environmentally more efficient crawler cranes, will comprise seven CKE and BME models, from 60 to 250 tonnes capacity. The units will also be on display at Intermat in April.
Crane operator fatality at Tilbury
A crane operator died earlier today after the crane he was operating overturned at Tilbury Docks in the UK. We do not know what type of crane, but do know that it had an elevated cab and that it turned over onto its side.
Three Linden Comansa flat top towers have been delivered for work on an extension of the El Dorado International Airport in Bogotá, Colombia. El Dorado is Latin America’s most active airport in terms of the flow of cargo and third most active in terms of passengers. The number of passengers increased in 2010, warranting a major upgrade.
UK based crane sales and service company Crowland Cranes has installed a new Crypton rolling road that can test mobile cranes and truck mounted work platfroms with axle weights up to 20 tonnes.
Indicative of both wind power’s continued maturation and the importance the industry places on the safety of its greatest asset, today the American Wind Energy Association (AWEA) and the U.S. Department of Labor’s Occupational Safety and Health Administration (OSHA) entered into an official Alliance to further protect the health and safety of the industry’s workers.
The Revised COP provides practical guidance to the industry as to how to use tower cranes safely and properly with a view to assisting duty holders in preventing accidents as well as complying with the Factories and Industrial Undertakings Ordinance and the Factories and Industrial Undertakings (Lifting Appliances and Lifting Gear) Regulations. The revision mainly involves incorporation of the good practices recommended in the second version of the Guidelines on Safety of Tower Cranes published by the Construction Industry Council into the COP, with a view to further enhancing the safety of tower crane operation.
A crane overturned yesterday in a suburb of Darwin, in the Northern Territory, Australia, dumping the pool it was lifting, after one of its outriggers gave way
The crane a Zoomlion QUY 1000 crawler crane owned by Ningxia Tianxin Construction and development was lifting a 5MW wind turbine nacelle at the production facility of Sinovel where it was made. The load was recorded as 318 tonnes which was within the cranes capacity.