Crane service provider Welti-Furrer Pneukran & Spezialtransporte AG has erected a 2.3MW Enercon E-70 wind turbine at an altitude of 2465 M, (Approx. 8,000 ft) close to the Swiss-Italian border for Germany’s Enercon GmbH using a Terex TC 2800-1 lattice boom truck crane to perform the lift.
Author; Unknown
Source: